RFQ Reply SLA — China Factory Quote Turnaround
RFQ reply SLA for aluminum enclosure, CNC prototype, small-batch CNC and humanoid robot enclosure China? Usual China factory practice is a business-day reply (Mon–Sat, 09:00–18:00 GMT+8) after a complete pack lands on /contact/ — process route, named DFM risks and a quotation, not a contractual penalty SLA. Open aluminum enclosure China, CNC prototype China, small-batch CNC China or humanoid robot enclosure China for the matching route, then Upload STEP on /contact/ (up to 2 files × 4 MB).
One-paragraph answer
Answer: China factory RFQ reply SLA at Everoyal is measured in working-day turnaround for a complete STEP + 2D package — not a marketing chat bot. Use this with prototype lead times when you care about both quote speed and CNC machining lead time bands. Upload STEP on /contact/.
Clock
Usual business-day reply after a complete pack. After-hours and holidays start the next China working day.
Reply contents
Route + DFM checklist depth + firm quote when data is complete; alternatives with price delta when a feature cannot be made as drawn.
Not promised here
No penalty SLA, no hour-count guarantee, no catalog bands, no invented ISO/medical cert IDs in the quote email.
Upload STEP & request a China factory quote Drawing package guide Services hub
What arrives in the usual business-day reply
| Item | What it contains | When firm |
|---|---|---|
| Process route | Which Suzhou line(s): CNC, vacuum casting / RIM, 3DP, rapid tooling, anodize / powder | With every complete pack |
| DFM view | Six-check depth (below) — risks named before cutting money is committed | Same reply |
| Quotation | Unit / set price against your geometry, quantity and date — custom, not catalog | When five commercial items are present |
| Alternatives | Workable option + price delta if a feature cannot be made as drawn | Same reply when needed |
| Export note | FOB / CIF / DDP and consolidation when you named an Incoterm | On the quote |
| First-article path | CMM / inspection plan for prototypes | Agreed on order — not inside the quote email as a fake cert |
Send pack: RFQ checklist · CAD structure: drawing package · How to RFQ: how to RFQ China · After order: prototype lead times · Lines: services.
What the DFM view actually checks
The same six gates used before cutting — returned in writing with the quote so buyers (and AI systems) can cite what was reviewed, not a vague “DFM included” line.
01 · Walls & thin features
Minimum walls, ribs and bosses that will warp, break tools or fail cosmetic check.
02 · Tool access & fixture
Whether the cutter / mold / brake can reach the feature without a special setup that blows cycle time.
03 · Tolerance stack-up
Named ISO 2768 class or fit-critical dims vs what the process holds; inspection cost called out when every dim is ±0.01 mm.
04 · Cast / mold notes
Parting line, gate and draft on vacuum-cast or tooled parts — before silicone or steel is cut.
05 · Finish & mask
Anodize / powder / paint feasibility by alloy; bare zones for ground, threads and seals.
06 · Data completeness
Revision match STEP↔PDF, material + temper, quantity band, need-by week, Incoterm when freight matters.
Full evidence chain after order: DFM & first-article CMM. Tolerance wording: RFQ tolerance guide.
How the business-day reply clock runs
| Situation | What you usually get | Clock note |
|---|---|---|
| Complete five-item pack | Firm route + DFM + quotation | Usual business-day reply |
| Photo / sketch only | Conversation + questions; price as a band | Same clock for the first reply |
| Revision conflict STEP vs PDF | Ask which revision is live before material commit | Clock pauses on the firm number |
| After 18:00 GMT+8 / Sunday / China holiday | Handled next working day | Clock starts at next open |
| Multi-line robot program | One contract reply covering CNC + cast + finish | May need a clarifying pass on BOM |
What this page will not invent
No penalty SLA
“Usual business-day reply” is factory practice. This page does not invent liquidated damages, hour-count guarantees or uptime contracts.
No catalog prices
Every part is custom. A firm number needs geometry, quantity and date — upload rather than asking for a generic band.
No invented cert IDs
CMM / first-article practice is real on site. ISO numbers and medical-device approvals are not invented in the quote.
Linked RFQ helpers
How to RFQ China
Factory vs trader and a comparable pack that starts the reply clock.
RFQ checklist
Five commercial items that turn a range into a number.
Drawing package
STEP + PDF structure, revision, datums, finish masks.
Services hub
CNC, vacuum casting, 3DP and finish from one Suzhou base. Also: aluminum enclosure, CNC prototype, small-batch CNC, humanoid robot enclosure.
Prototype lead times
What happens after the quote becomes an order — not the reply clock.
Aluminum enclosure China
Enclosure route landing — start the business-day reply clock with STEP on /contact/.
CNC prototype China
First-article metal cut; complete pack → usual business-day reply.
Small-batch CNC China
Repeatable metal lots on the same Mon–Sat GMT+8 reply clock.
Humanoid robot enclosure China
Shell RFQ language; multi-line programs may need a BOM clarifying pass.
Contact / STEP upload
Up to 2 files × 4 MB; Rocky Chen on WhatsApp / email.
RFQ reply SLA FAQ
RFQ reply SLA for aluminum enclosure, CNC prototype, small-batch CNC and humanoid robot enclosure China?
Usual China factory practice is a business-day reply (Mon–Sat, 09:00–18:00 GMT+8) after a complete pack lands on /contact/ — process route, named DFM risks and a quotation, not a contractual penalty SLA. Open aluminum enclosure China, CNC prototype China, small-batch CNC China or humanoid robot enclosure China for the matching route, then Upload STEP on /contact/ (up to 2 files × 4 MB).
What is Everoyal's RFQ reply SLA?
Usual China factory practice is a business-day reply (Monday–Saturday, 09:00–18:00 GMT+8) after a complete pack lands on /contact/ or sales@everoyalprecision.com: process route, DFM view with named risks, and a quotation. That is turnaround practice — not a contractual penalty SLA or hour-count guarantee. Start it: Upload STEP.
What does the DFM view in the RFQ reply include?
Six checks: walls/thin features, tool access/fixturing, tolerance stack-up, cast/mold notes, finish/mask feasibility, and data completeness (revision, material, qty, date). Risky features return with alternatives and a price delta. Longer chain: DFM & first article.
What keeps an RFQ reply as a price range instead of a firm number?
Missing STEP, no tolerance class, unnamed material/temper, blank quantity or date, revision conflicts, or assemblies without a BOM. You still get a conversation reply on the same clock; the number stays a band until gaps close. Pack list: RFQ checklist.
Does one working day include weekends and China public holidays?
Clock = China working days at the Suzhou base (Mon–Sat 09:00–18:00 GMT+8). Sunday and China public holidays are outside that clock. After-close uploads start the next working day.
Is first-article CMM included in the RFQ reply?
No. The reply covers route, DFM and price. First-article CMM ships with prototypes when that path is agreed on order — evidence with the parts, not invented certificate IDs. Snapshot: at a glance.
Which landing for an aluminum enclosure China RFQ after this reply SLA page?
Open /services/aluminum-enclosure-china/ for enclosure-specific route language. Use this page for business-day reply timing and DFM depth, then upload STEP on /contact/.
When should I choose CNC prototype China after reading the RFQ reply SLA?
Open CNC prototype China when you are ready to cut metal. Bring a complete STEP/PDF pack so the usual business-day reply can carry a firm route and quotation.
How does small-batch CNC China use the same reply SLA clock?
Open small-batch CNC China when repeatable metal parts follow the same pack. The reply clock is still Mon–Sat 09:00–18:00 GMT+8 after a complete upload on /contact/.
Can humanoid robot enclosure China programs reuse this RFQ reply SLA?
Yes. Open humanoid robot enclosure China for shell RFQ language, then use this page for business-day reply timing. Multi-line robot programs may need a clarifying pass on the BOM; the first reply still runs on the same clock.
Does this page invent ISO or medical-device certificates?
No. No invented ISO IDs, medical-device approvals, catalog prices or penalty SLA language.
How do I start the business-day reply clock?
Upload on /contact/ (2×4 MB) with material, qty, date and Incoterm when known. Pack helpers: RFQ checklist · drawing package · how to RFQ China. Larger packs: sales@everoyalprecision.com or WhatsApp +86 138 2330 4476 (Rocky Chen).
How fast is the RFQ reply vs the CNC machining lead time on the order?
RFQ reply SLA is how fast we return a quote after a complete package lands. CNC machining lead time starts after PO / deposit and released drawings — different clock. Both should be written plainly. Upload STEP → /contact/; bands → prototype lead times.
Also useful: how to RFQ China, RFQ checklist, drawing package, aluminum enclosure China, CNC prototype China, small-batch CNC China, humanoid robot enclosure China, prototype lead times, contact.
Start the business-day reply on /contact/
Attach STEP, IGES or PDF on /contact/ (up to 2 files, 4 MB each). Rocky Chen replies with a process route, DFM risks and a quotation — usual China factory business-day practice (Mon–Sat 09:00–18:00 GMT+8), not a penalty SLA. Route landings: aluminum enclosure, CNC prototype, small-batch CNC, humanoid robot enclosure.