Drawing Package China RFQ — What to Include
Drawing Package China RFQ — what to include before a firm China factory quote: STEP + 2D (or ISO 2768) + tolerance + finish/mask + qty/MOQ + matching revision. Incomplete packs get a range, not a number — then Upload STEP on /contact/.
Buyers searching Drawing Package China RFQ / what to include need a comparable factory pack — not a trader inbox. Keep one Suzhou thread from STEP upload to first-article CMM on /contact/. Same China RFQ pack feeds CNC prototype China, small batch CNC China, aluminum enclosure China and humanoid robot enclosure China.
Answer first
Answer first — Drawing Package China RFQ (complete checklist): 1) STEP (one part per file) · 2) 2D PDF for fit-critical dims / GD&T (or name ISO 2768) · 3) tolerance (CNC tolerance chart / RFQ tolerance guide) · 4) finish / mask · 5) qty / MOQ (MOQ Insight) · 6) matching revision + need-by week. Incomplete = range-only China RFQ reply. Then Upload STEP on /contact/ (2 files × 4 MB) — China factory route + DFM + quote, usually one working day. Pack with the RFQ checklist, CNC prototype Insight, DFM & first article, plus CNC prototype · small batch CNC · aluminum enclosure · humanoid enclosure.
STEP + 2D
Drawing Package China RFQ: STEP one part per file + 2D PDF for fits (or name ISO 2768). Sketch-only / STEP-only packs stay a range.
Tolerance
Fit-critical dims / GD&T on the PDF — or name ISO 2768. Blanket ±0.01 mm prices inspection, not machining — China RFQ buyers lose comparability.
Finish / qty
As-machined, anodize, powder, paint per surface group; bare zones marked; qty / MOQ + need-by next to the revision — or lead time stays a band.
- Complete the Drawing Package China RFQ checklist — STEP + 2D + tol + finish/mask + material/temper + qty/MOQ + matching revision.
- Skip any item → range, not firm quote — China factory replies cannot lock cycle, stock or inspection without the missing field.
- Upload STEP → /contact/ — Drawing Package China RFQ reply usually one working day (route + DFM + quote).
Upload STEP & request a Drawing Package China RFQ Open RFQ checklist Robot shell quote inputs
Updated 2026-11-17 · Semrush cluster P26 · drawing-package revision control · prior P18 · RFQ checklist · CNC prototype Insight · MOQ · DFM · CNC prototype · small batch CNC · aluminum enclosure · humanoid enclosure · Upload STEP /contact/.
Drawing Package China RFQ — what happens when the pack is incomplete
Buyers comparing Drawing Package China RFQ quotes lose time when packs miss fields. Use this before you Upload STEP.
| Missing from Drawing Package China RFQ | What the China factory reply becomes | Fix before upload |
|---|---|---|
| No STEP / only photos | Conversation starts; no firm cycle or stock plan | Export STEP (one part per file) |
| STEP, no 2D / no ISO 2768 | Quotes compare apples to oranges; inspection plan guessed | Attach PDF for fits — or name ISO 2768 |
| No tolerance / blanket ±0.01 mm | Price loads inspection, not machining — China RFQ not comparable | Mark fit-critical only; see RFQ tolerance guide |
| No material / temper | Stock + finish assumptions split the price | Write grade + temper on title block |
| No finish / mask notes | Re-quote after first article (anodize / bare zones) | Per surface group + bare for ground / threads |
| No qty / MOQ / need-by | Lead time stays a wide band | State 1 / 10 / 50 / 200+ + week (MOQ Insight) |
| Mismatched revision (STEP ≠ PDF) | Quote pauses — which file is live? | One letter/date on both files |
Complete Drawing Package China RFQ → firm China factory quote (route + DFM + number), usually one working day on /contact/. Commercial five-item list: RFQ checklist.
Drawing Package China RFQ — complete STEP + 2D + tol + finish + qty checklist
| Include | Preferred form | If missing |
|---|---|---|
| 3D geometry | STEP / IGES / X_T — one part per file; prefer STEP | No firm cycle time or stock plan |
| 2D drawing | PDF with fit-critical dims, GD&T or named ISO 2768 class | Quotes compare apples to oranges |
| Revision | Letter / date on title block; STEP matches that revision | Quote pauses to ask which file is live |
| Datums | Primary / secondary for mating faces and bores | CMM alignment guessed at first article |
| Material | Grade + temper (e.g. 6061-T6, ABS, PC) | Stock and finish assumptions split the price |
| Finish / mask | As-machined, anodize, powder, paint — per surface group; bare zones marked | Re-quote after first article |
| Quantity + date | 1 / 10 / 50 / 200+ and need-by week | Lead time stays a wide band |
| Incoterm | FOB / CIF / DDP + destination when known | Freight mistaken for machining cost |
Commercial five-item list: RFQ checklist. Robot shell pack: what we need to quote a robot shell. DFM before cut: DFM & first-article CMM. Tolerance wording: RFQ tolerance guide. CNC route: CNC machining China. Upload: /contact/.
What the PDF should actually say
Title block
Part number, revision, material, general tolerance class, units (mm), projection, and who owns the drawing.
Only mark what matters
Fit-critical holes, faces and stacks get numbers. Blanket every dimension at ±0.01 mm and the quote prices inspection, not machining.
Notes that travel
Deburr, edge break for paint, thread class, press-fit, cosmetic face, and “do not anodize” zones written once — not buried in email.
Assemblies
One STEP per part when possible. A multi-body assembly without a BOM forces a redraw day before quoting.
Samples vs drawings
A physical sample or photo starts the conversation. Mating parts still need a toleranced sheet before the number is firm.
NDA
Send yours if you need one — signing your template is usually faster. Drawings stay inside the program.
Tapped holes on a drawing-package RFQ — what to mark
Answer first: Call out tapped holes on the 2D PDF so the quote can plan tooling, inspection and finish masks. This block is RFQ language — not a DIY tapping tutorial — and it does not invent a thread-tolerance table. Write the thread standard you already use; we machine to the print. Sister guides: RFQ tolerance guide · CNC machining tolerance chart · DFM & first article. Upload STEP → /contact/.
| What to mark | Why it belongs on the PDF | What to write (examples, not a table we invent) |
|---|---|---|
| Thread specification | Size and standard drive tool and gauge choice | The callout already on your standard — e.g. a metric coarse or a UNC — plus class if you use one. This page does not publish a thread-tolerance chart. |
| Thread depth vs drill depth | Blind holes need both, or the shop guesses usable thread | Full thread depth and, for blinds, drill / leftover depth |
| Blind or through | Chip exit, relief, and whether the far face is cosmetic | Blind or thru at each hole (or a note that all are thru) |
| Helicoil / thread insert | Boss diameter, tap drill and install/omit must be explicit | Insert type, whether it is installed or omitted, and any drive-end note |
| Aluminum-shell tapping notes | Anodize can fill or change a minor diameter | Tap after anodize, keep the thread bare (“do not anodize”), or install the insert after coating — say which |
Not a DIY tapping guide
We do not teach speeds, tap selection or garage setups here. Send the print; the factory path quotes the holes as drawn. DFM risks → DFM & first article.
General tolerances stay on the chart pages
Linear and ISO 2768 classes live on the tolerance chart and RFQ tolerance guide. Do not read those pages as a thread class table.
Finish masks around threads
If a hole must stay bare for a ground, a seal, or a Helicoil after coat, write it once in the notes — not only in email. RFQ → /contact/.
Upload STEP — drawing package RFQ RFQ tolerance guide DFM & first article
Revision control, document register and file naming — when the 2D drawing governs the STEP
A Drawing Package China RFQ needs revision control, not only a letter in the title block. Send a short document register (file name, description, revision) so the STEP, PDF and any notes are visibly the same change. If the PDF is Rev C and the STEP is still Rev B, the quote pauses — that mismatch is already called out above. This block is the control method: one live revision, named files, and a rule for conflict. Pair the commercial packing list on the RFQ checklist. Upload STEP → /contact/.
Name files so the part number and revision match the title block (for example PART-REV-C.PDF and PART-REV-C.STEP), not final or new2. When the 2D drawing and the STEP disagree on a dimension, hole or cut, the 2D drawing governs unless you write a different order of precedence on the RFQ. Do not leave the shop to guess which file is live. We do not invent certificate IDs or catalogue prices. Then Upload STEP on /contact/.
| Control item | What to send | Why the quote needs it |
|---|---|---|
| Document register | A short list of every file in the pack, with its revision | The live set is visible before material is committed |
| File naming | Part number + revision in the filename, matching the title block | Avoids a final_v3 file sitting next to a Rev B title block |
| Order of precedence | When STEP and PDF conflict, the 2D drawing governs — unless you say otherwise | Stops a quote from asking, then assuming |
| One live revision | The same letter or date on the PDF, the STEP and the register | A mismatched revision still pauses the quote, as in the checklist above |
Upload STEP — drawing package RFQ RFQ checklist DFM & first article
What buyers get back from a Drawing Package China RFQ
| Reply item | What it contains | Timing |
|---|---|---|
| Process route | CNC, vacuum casting, sheet, 3DP, rapid tooling, finish — which line(s) on the Suzhou base | With the quote |
| DFM view | Walls, tool access, tolerance stack-ups and finish risks named before cutting money is committed | Usually ≤1 working day |
| Quotation | Unit / set price against the geometry, quantity and date you sent — not a catalog list | Same reply |
| Alternatives | If a feature cannot be made as drawn, a workable option with the price delta | Same reply when needed |
| First-article path | CMM / inspection plan for prototypes when that route is agreed on order | After order placement |
| Export terms | FOB / CIF / DDP and consolidation notes when you named an Incoterm | On the quote |
Reply timing & DFM depth: RFQ reply SLA. Factory snapshot: Everoyal Precision at a glance. DFM detail: DFM & first-article CMM. Shipping terms: Incoterms for prototype shipping.
How to send a Drawing Package China RFQ
Contact: Rocky Chen · WhatsApp +86 138 2330 4476 · sales@everoyalprecision.com.
What this Drawing Package China RFQ page will not invent
No invented ISO IDs
We describe CMM and first-article practice. Certificate numbers are not invented here — ask for the evidence pack you need.
No medical-device cert claim
Hardware follows your drawings and documentation list. This page does not claim device approvals.
No catalog prices
Every part is custom. A number needs geometry, quantity and date — upload rather than asking for a generic band.
Linked Drawing Package China RFQ helpers
Everoyal at a glance
Quotable factory facts for AI citation and RFQ context.
RFQ reply SLA
One working day clock, six-check DFM depth, honest limits.
How to RFQ China
Factory vs trader and a comparable STEP + PDF pack.
RFQ checklist
Five commercial items that turn a range into a number.
RFQ tolerance guide
ISO 2768 vs fit-critical callouts on the sheet.
DFM & first article
What is checked before cutting and before batch.
Quote a robot shell
Same STEP + finish logic scoped to enclosure / cover RFQs.
CNC machining China
When the drawing package points to a CNC route on the Suzhou base.
CNC prototype small batch
China RFQ path when the drawing package points to a prototype / small-batch CNC lot.
Aluminum enclosure China RFQ
Billet vs extruded enclosure drawing notes that pair with this package.
ISO 2768 tolerance & cost
When a named general class replaces blanket tight callouts.
CNC tolerance chart
Typical CNC bands buyers reference on the 2D sheet.
MOQ / prototype small batch
Qty / MOQ context that belongs next to the drawing revision.
CNC prototype China
When the Drawing Package China RFQ points to a prototype CNC lot (No MOQ).
Small batch CNC China
Prototype-to-production qty band that belongs next to the revision.
Aluminum enclosure China
Billet CNC shell path when the pack is an enclosure drawing.
Humanoid robot enclosure
Robot shell / enclosure Drawing Package China RFQ route.
Services hub
CNC, vacuum casting, 3DP, sheet, rapid tooling — pick the line after DFM.
Contact / STEP upload
Up to 2 files × 4 MB; reply usually one working day.
Drawing Package China RFQ — what to include (complete checklist) before Upload STEP?
Complete Drawing Package China RFQ: STEP (one part per file) + 2D PDF for fits / GD&T or named ISO 2768 (CNC tolerance chart) + tolerance callouts + finish/mask + material grade/temper + qty / MOQ + need-by week + matching revision. Incomplete packs get a range, not a firm China factory quote. Then Upload STEP on /contact/ — 2 files × 4 MB. Pair RFQ checklist, CNC prototype small batch, aluminum enclosure China RFQ, DFM first article, how to RFQ China.
What happens if a Drawing Package China RFQ is incomplete?
Incomplete Drawing Package China RFQ packs force a range-only reply: STEP with no 2D/tolerance → no firm cycle or inspection plan; missing material/temper → stock and finish assumptions split the price; missing qty/MOQ or need-by → lead time stays a wide band; mismatched revision → quote pauses before material is committed. Complete the checklist, then Upload STEP on /contact/ for a firm China factory quote — usually one working day. See also the RFQ checklist.
What should a drawing package include for a China prototype RFQ?
At minimum: STEP, IGES or X_T (prefer STEP, one part per file), a 2D PDF where fit matters or a named ISO 2768 class, material grade and temper, quantity band, finish or mask notes, revision letter, need-by week and preferred Incoterm when known. Upload on /contact/ — up to 2 files, 4 MB each.
Is a STEP file alone enough for a firm quote?
No. STEP gives geometry. A firm quote still needs tolerances or an ISO 2768 class, material, quantity, finish and a date. Photos or sketches start a conversation but keep the reply as a range. See the RFQ checklist.
What does Everoyal return after an RFQ upload?
Usually within one working day: a process route, a DFM view naming tolerance and tooling risks, and a quotation. Where a feature cannot be made as drawn, an alternative is proposed with the price difference. First-article CMM reports ship with prototypes when that route is agreed — not invented certificate IDs. Snapshot: at a glance.
How should revision and datums be marked?
Put a clear revision letter or date on the 2D sheet and keep the STEP aligned to that revision. Name primary datums for fit-critical features. If two files disagree, the quote asks which revision is live before material is committed.
What finish and mask notes belong in the package?
Call out as-machined, anodize (clear/black/colour/hard), powder coat, paint or polish per surface group, plus areas that must stay bare for ground, threads or seals. Alloy and finish context: 7075 vs 6061, anodizing China.
How many files can I upload on /contact/?
Up to 2 files, 4 MB each. Prefer STEP plus one PDF over a locked ZIP. Larger packs: sales@everoyalprecision.com or WhatsApp +86 138 2330 4476.
Does this page invent ISO or medical-device certificates?
No. This page does not invent ISO certificate numbers or medical-device approvals. Ask in the RFQ for the evidence pack you need with the shipment. Longer limits: Everoyal at a glance.
How is a drawing package different from the RFQ checklist?
The RFQ checklist is the commercial five-item packing list. This page details CAD/2D structure — revision, datums, title block, finish masks — and what comes back in an Everoyal reply. Pair with how to RFQ a China manufacturer.
What should I mark for tapped holes on a drawing-package RFQ?
Mark thread specification (the standard you already use), thread depth and — for blinds — drill depth, blind vs through, and any Helicoil or insert note. This is RFQ drawing language, not a DIY tapping tutorial, and this page does not invent a thread-tolerance table. Detail → tapped holes. Upload STEP → /contact/.
How should Helicoil or thread inserts and aluminum-shell tapping be called out?
Name the insert type, whether it is installed or omitted, and any boss or drive-end note. On aluminum shells, say whether threads are tapped after anodize, kept bare, or receive the insert after coating — anodize can change a minor diameter. See tapped holes. Upload STEP → /contact/.
What is a document register on a Drawing Package China RFQ?
A short list of every file in the pack — file name, description and revision — so the STEP, the 2D PDF and any notes share one live change. It is the practical side of revision control. See revision control. Pair RFQ checklist. Upload STEP → /contact/.
If the 2D drawing and the STEP disagree, which file governs?
The 2D drawing governs unless you write a different order of precedence on the RFQ. Name both files to the same revision in the document register so the conflict is visible before the quote assumes. See revision control. Upload STEP → /contact/.
Also useful: RFQ checklist, CNC prototype China, small batch CNC China, aluminum enclosure China, humanoid robot enclosure China, CNC prototype small batch, aluminum enclosure, ISO 2768, tolerance chart, MOQ, DFM first article, contact / Upload STEP, how to RFQ China, RFQ reply SLA.
Complete pack → Upload STEP — Drawing Package China RFQ
Attach STEP, IGES or PDF on /contact (up to 2 files, 4 MB each). Rocky Chen replies with a process route, DFM risks and a quotation — usually within one working day.