Insights

Working notes from the engineering team: how a process gets chosen, what a quotation actually needs, where small-batch production stops being cheap.

White and black cosmetic robot covers in a batch

Which process should a robot enclosure use?

Machined, printed, cast, formed or moulded: the route changes with quantity, geometry and how the surface will be read at arm’s length. A decision table by stage of the programme.

Process selection · 6 min read

Five-face machined housing on the inspection bench

What we need to quote a robot shell

The five items that turn an enquiry into a firm number, what a sketch alone can and cannot get you, and what comes back within one working day.

Quotation · 4 min read

These pages describe how programmes run at the Suzhou base. They do not quote prices: a number needs your data and your quantity, and we would rather ask than guess.

Start a programme

Send the drawings, get a DFM view back

Rocky Chen replies with a process route, the tolerance risks we see in your data and a quotation — usually within one working day.

Enquiry form and details

ContactRocky Chen
BaseSuzhou, Jiangsu, China. Visits by appointment.