Custom Sheet Metal Parts: A Practical Drawing-to-RFQ Walkthrough
Define the part function, release controlled sheet metal blueprints, package quantity and finish data, then send an RFQ factories can quote without guessing your intent.
Can a supplier quote custom sheet metal parts when the drawing leaves material, bend data, tolerances, or inspection expectations open? Usually not with confidence. Start by defining what the part must do, then release a controlled drawing, matching CAD file, quantity break, finish requirement, and inspection plan.
That sequence prevents a common handoff failure: a factory prices one interpretation while the engineering team expects another. The method below follows a robot joint cover from functional definition through sheet metal blueprints, DFM review, quotation assumptions, and first-article approval.
A comparable quote requires the same drawing revision, file set, quantity break, finish requirement, and inspection expectation for every supplier.
Start with the part function before opening the RFQ template
Sheet metal part design starts with the assembly, not the quotation form. A fabricator needs to know whether the part carries load, protects an enclosure, clears moving hardware, accepts fasteners, or presents a visible surface. Those requirements affect the manufacturing route, feature layout, material choice, and inspection plan.
Write the functional requirements before adding fabrication preferences. For a small robot joint cover, record the internal mechanism clearance, mounting-hole pattern, service opening, adjacent-motion envelope, expected exposure, and fastener type. A dimension that controls alignment belongs in the drawing as a controlled requirement. A dimension added only to describe an attractive edge or preferred bend sequence needs a different note or can remain informational.
Illustrative example: assume a robot joint cover protects an internal actuator and must clear a rotating link. The mounting holes locate the cover against a mating bracket, so their position belongs among the controlled interface dimensions. The outer edge radius affects appearance and deburring, but it does not automatically deserve the same tolerance.
Everoyal Precision describes its work around robot shells, joint housings, and prototype or small-batch parts built to drawing. For any supplier, give the same functional information before asking whether the part should use formed sheet metal, another process, or a secondary operation. Related reading: the complete guide to custom sheet metal fabrication for robot enclosures and sheet metal enclosure design guidelines.
Build sheet metal blueprints that a fabricator can read without guessing
A native CAD model shows geometry, but it does not always state what the supplier must inspect or which revision controls the order. Released sheet metal blueprints should resolve that gap. The PDF drawing and its revision should govern manufacturing and inspection; the 3D file should match it.
Use a formed view as the primary representation. Add an isometric view for orientation, section views where walls or internal features hide information, enlarged views for holes and reliefs, and a flat pattern when it helps the fabricator verify development. A drawing for custom sheet metal parts should also identify bend direction, bend location, and bend angle where those details affect fit.
SOLIDWORKS documents bend line notes as a way to communicate bend information on sheet metal drawings. Autodesk Inventor also records material, thickness, bend and corner-relief preferences, unfolding rules, and flat-pattern reporting preferences within sheet metal rules. Those settings are process inputs, not universal manufacturing truths. See the SOLIDWORKS bend line notes documentation and Autodesk Inventor sheet metal rules documentation.
Put these items in the title block or general notes:
- Units, projection method, part number, revision, and drawing date.
- Material designation, thickness, temper or grade where relevant.
- Surface finish, coating or plating requirement, and visible-surface instructions.
- Deburring, sharp-edge, burr, and cosmetic requirements.
- General tolerance standard or company tolerance table.
- Critical dimensions, datums, inspection notes, and quantity.
A supplier should not have to infer whether the flat pattern is for reference, whether a bend note is mandatory, or whether an unmarked edge receives a general tolerance. Those decisions belong in the released sheet metal drawings. For package composition, see what to include in a drawing package.
Define bends, bend reliefs, and the flat pattern before release
The formed part and the developed blank are linked, but they are not interchangeable. State the bend angle, inside radius, bend direction, relief style, and any required bend sequence when those details affect assembly or appearance.
Sheet metal bend allowance depends on material, thickness, tooling, inside radius, bend method, grain direction, and material condition. K-factor is therefore a design or process input, not a universal number to copy into every model. Autodesk Inventor’s sheet metal rules include unfolding selection, bend and corner relief preferences, and flat-pattern bend-angle reporting, which explains why a flat pattern depends on the active rule set.
Consider a hole placed close to a flange bend. Forming can distort the hole, reduce tool access, or leave insufficient material for a clean bend. The supplier should flag the feature and propose a correction; it should not silently move the hole while keeping the old drawing revision.
Include a bend table or enlarged bend detail when several bends could be read in more than one direction. If the supplier proposes a different relief or bend sequence, record the proposal as an engineering change before production.
The flat pattern is a manufacturing result governed by material, thickness, tooling, bend radius, bend allowance, and sheet metal rules.
Use tolerances that protect fit without pricing every edge as precision work
Sheet metal tolerances should follow function. Tighten the bolt pattern, locating surface, bearing clearance, or mating edge when the assembly needs it. Leave enclosure edges and nonfunctional dimensions under a stated general tolerance when they do not affect fit.
Separate the requirements instead of writing “machine to close tolerance.” A useful drawing distinguishes dimensional tolerance, bend-angle tolerance, hole position, flatness, perpendicularity, burr limits, and cosmetic acceptance. A flange hole pattern that aligns to a mating component belongs in the first group; a hidden return flange may use the general tolerance if the assembly allows it.
| Requirement type | Example drawing treatment | Why it matters |
|---|---|---|
| Functional dimension | Control hole position from assembly datums | Protects alignment and interchangeability |
| General dimension | Apply a stated general tolerance | Avoids pricing every edge as precision work |
| Cosmetic requirement | Define visible surface, scratches, burrs, and coating acceptance | Sets appearance expectations separately from fit |
ISO 2768 addresses general linear and angular tolerance concepts, but you must verify the current standard and applicable class for the drawing. ASME Y14.49 provides supplemental dimensioning and tolerancing guidance; it does not replace the part-specific engineering requirements. AMS2242H is narrower still: it covers established manufacturing tolerances for specified corrosion- and heat-resistant steel, iron alloy, titanium, and titanium alloy sheet, strip, and plate. Do not apply it to every sheet metal material by default.
Use a tolerance table that names its source, class, and exceptions. If a supplier cannot hold a feature as drawn, obtain a written capability or DFM response before changing the requirement.
Choose material, thickness, finish, and grain direction as one specification
Material selection affects forming, stiffness, surface appearance, corrosion behavior, coating adhesion, and cost. A note such as “steel sheet” leaves too much unresolved for a reliable custom sheet metal quote.
State the exact designation where known. Add thickness, grade or temper where relevant, and identify whether an approved substitute is acceptable. If substitutions are allowed, define who approves them and what evidence the supplier must provide. A cheaper substitute that changes springback or coating behavior can create a fit problem later.
Finish should follow use. A visible robot shell may need a defined outer-surface appearance, while an internal bracket may only need deburring and corrosion protection. Electrical contact, friction, coating adhesion, environmental exposure, and post-forming dimensions can each lead to different finish requirements.
Ask whether grain direction matters. It can affect bend cracking, visible lines, stiffness, and repeatability, particularly with stainless steel or aluminium. The drawing or RFQ should state the preferred grain direction when the design depends on it, or ask the supplier to recommend one based on the material and forming route.
Illustrative robot-shell example: a housing with a visible outer face, a stiff mounting flange, and an indoor operating environment has three separate decisions. The outer face needs a cosmetic and finish requirement. The flange needs enough stiffness and a controlled hole pattern. The environment determines whether corrosion protection is needed. Calling for generic “steel sheet, painted” does not answer all three.
Check material-specific sheet tolerances against the applicable specification. AMS2242H is an example for the alloy families and product forms within its scope, not a general tolerance reference for aluminium, mild steel, or every formed part.
Turn the drawing into a quote-ready RFQ package
A sheet metal RFQ works when the supplier can price the same scope you intend to buy. Send a released drawing, matching 3D model, quantity breaks, finish details, inspection expectations, packaging requirements, destination, and commercial assumptions in one controlled package.
Request separate pricing for a prototype quantity, a low-volume quantity, and a repeat-order quantity when you are comparing production routes. Do not ask for invented production results or assume that a prototype price predicts repeat-order economics. Ask the factory to show what changes between the quantity breaks, including tooling, setup, secondary operations, and packaging.
Use this RFQ package checklist:
- Released PDF drawing with part number and revision.
- Matching STEP, IGES, or X_T model, with file names tied to the revision.
- Quantity breaks, such as one prototype scope and a separate small-batch or repeat-order scope.
- Material, thickness, temper or grade, grain direction, finish, and approved substitution policy.
- Critical dimensions, general tolerances, inspection datums, and required quality documents.
- Secondary operations, deburring, coating, marking, assembly, or packaging requirements.
- Destination, delivery terms requested, packaging constraints, and export documentation needs.
- Questions requiring supplier confirmation before order release.
Ask the factory to list assumptions rather than bury them in a price. The quotation should identify material substitutions, tooling charges, secondary operations, inspection scope, packaging, and drawing features that need clarification. A supplier should quote the drawing revision exactly as issued and list exceptions; silent changes make competing quotes impossible to compare.
For overseas buyers, Everoyal Precision states that it works with STEP, IGES, or X_T files plus toleranced 2D drawings where needed. Its stated export terms include FOB, CIF, and DDP. Confirm the applicable commercial terms for your shipment instead of treating any one term as automatic. See also how to RFQ a China manufacturer and sheet metal China.
A supplier assumption belongs in the quotation until the buyer approves it in an engineering document.
Review factory feedback before approving custom sheet metal parts
A sheet metal DFM review should happen before order release, while a proposed change is still inexpensive to evaluate. Ask the supplier to review minimum flange width, bend access, hole-to-bend distance, corner relief, weld access where applicable, distortion risk, and inspection datums.
The supplier should also explain whether the selected bend data and flat pattern support the formed geometry. Autodesk Inventor’s rules and SOLIDWORKS bend notes show why bend information needs a defined relationship to the model and drawing. A flat-pattern export alone does not prove that tooling, relief, material, and bend sequence work together.
Illustrative review: a factory finds that a mounting hole sits too close to a bend and proposes moving it away. That may improve forming, but it can also shift the hole relative to the mating bracket. The buyer must check the assembly, approve the new location, update the drawing and CAD model, and issue a new revision before production.
Record an approved deviation through one of these controlled artifacts:
- Marked-up drawing with approval and date.
- Revised CAD model and released drawing with a new revision.
- Formal deviation note linked to the purchase order and affected feature.
- Inspection instruction that identifies the approved condition.
An email can support the discussion, but it should not remain the only record when CAD and drawing data change. First-article checks should cover critical dimensions, bend angles, hole locations, finish, burrs, and fit against the mating assembly. Define the inspection scope before quoting so the supplier can price the same expectation.
Use this drawing-to-RFQ workflow for a small-batch robot housing
The following is an illustrative workflow for a small-batch robot sheet metal enclosure. It uses assumptions to show the handoff; it does not describe a specific Everoyal Precision customer part or promised result.
- Define the envelope. Record the moving-part clearance, protected mechanism, mounting interfaces, service opening, fasteners, and visible surfaces.
- Model the formed housing. Choose a provisional material and thickness, add bend radii and reliefs, and confirm that the enclosure can be formed and assembled.
- Add assembly features. Control the mounting-hole pattern and locating edges from useful datums. Keep decorative or nonfunctional edges under the general tolerance where appropriate.
- Prepare the drawing. Add formed, section, detail, and isometric views. Include bend direction, inside radius, material, finish, deburring, revision, and inspection notes. Include the flat pattern when it helps review development.
- Review tolerances. Separate the flange hole pattern and mating edges from enclosure dimensions that do not control fit. State the general tolerance source and class.
- Package the files. Attach the released PDF and matching STEP, IGES, or X_T file. Use identical part numbers and revision labels.
- Request comparable quotes. Give each supplier the same quantity breaks, finish, packaging, destination, and inspection requirements. Ask each supplier to list assumptions.
- Approve DFM changes. If the supplier moves a hole, changes a relief, or recommends another bend sequence, check the assembly and release the approved change through drawing revision control.
- Plan first-article review. Identify the critical dimensions, bend angles, hole locations, finish, burr limits, and mating fit that require review before repeat orders.
For the flange example, the hole pattern is an assembly interface and receives direct control. The remaining enclosure edges can use general tolerances only if the clearance, appearance, and assembly checks allow it. That distinction keeps the drawing practical without asking every feature to behave like precision-machined geometry.
Submit the RFQ with clear assumptions and a controlled revision
Before sending custom sheet metal parts for quotation, run this final checklist:
- One released drawing revision controls the request.
- The attached CAD files match the drawing part number and revision.
- Quantity breaks separate prototype, small-batch, and repeat-order needs.
- Material, thickness, finish, grain direction, and approved substitutions are stated.
- Critical tolerances, general tolerances, bend notes, reliefs, and inspection datums are defined.
- Packaging, destination, requested commercial terms, secondary operations, and quality documents are listed.
- Supplier assumptions, tooling charges, and proposed changes must appear in the quotation.
Everoyal Precision works with formed and small-batch parts for applications that include robot shells and joint housings. Submit the controlled drawing package through the Everoyal Precision RFQ page, or email sales@everoyalprecision.com with the drawings, quantity, and material. A clear revision and visible assumptions give every supplier the same scope to review. Company scope is summarized in Everoyal Precision at a glance.
Related reading
- Custom bent metal: what to specify on a robot enclosure drawing
- Complete guide: custom sheet metal for robot enclosures
- What to include in a drawing package
- How to RFQ a China manufacturer
- Sheet metal enclosure design guidelines
- Sheet metal fabrication China
- Everoyal Precision at a glance
References
- About Sheet Metal Rules (Autodesk Inventor)
- Sheet Metal Bend Line Notes (SOLIDWORKS)
- ISO 2768: General linear and angular tolerance limits
- Y14.49 Supplemental Dimensioning and Tolerancing Specification
- AMS2242H material-specific sheet, strip, and plate tolerances
Questions
What belongs in a custom sheet metal parts RFQ package?
A released PDF drawing with part number and revision, a matching STEP/IGES/X_T model, quantity breaks, material/thickness/temper, finish and grain notes, critical and general tolerances, inspection datums, secondary operations, packaging, destination/commercial terms, and questions that need supplier confirmation before order release.
Should the flat pattern control the order?
No. The formed PDF drawing and its revision should govern manufacturing and inspection; the 3D file should match it. The flat pattern is a manufacturing result that depends on material, thickness, tooling, bend radius, bend allowance and sheet metal rules — treat it as supporting data, not sole authority.
How should sheet metal tolerances be set on the drawing?
Protect fit on bolt patterns, locating surfaces and mating edges with controlled dimensions. Leave nonfunctional enclosure edges under a stated general tolerance. Separate dimensional, bend-angle, hole position, flatness, burr and cosmetic requirements so the shop does not price every edge as precision work.
What should happen when a supplier proposes a DFM change?
Check the assembly impact, then record approval with a marked-up drawing, a new CAD/drawing revision, a formal deviation note linked to the PO, or an updated inspection instruction. Do not leave a silent geometry change under the old revision.
Does Everoyal Precision claim die casting or medical-device certification?
No. Suzhou Everoyal Precision focuses on CNC machining, sheet metal fabrication, vacuum casting and RIM, rapid tooling, 3D printing and finishing for industrial and robotics programs. We do not claim die-cast production or medical-device certification.
Send the controlled drawing package
Upload STEP/IGES/X_T plus the released PDF. Rocky Chen replies with DFM risks, quote assumptions and a quotation — usually within one working day when the package is complete.