China RFQ Checklist — Drawing Package Ready

China RFQ checklist before a firm quote: make the pack drawing package ready — STEP/IGES (or X_T), fit-critical tolerances or an ISO 2768 class, material grade, quantity band, finish per surface group, need-by week and preferred Incoterm. Pair the deep dive Drawing Package China RFQ — what to include, then Upload STEP on /contact (up to 2 files, 4 MB each) for a Suzhou China RFQ with DFM view and quotation, usually within one working day.

Upload STEP & request China RFQ

Updated 2026-11-06 · 3rd pass

Why the checklist exists

Most China RFQs arrive with geometry and nothing else — that produces a range, not a number you can order against. This China RFQ checklist is what a firm quote needs at Everoyal’s Suzhou base when the pack is drawing package ready. Read what to include in a drawing package, then Upload STEP on /contact.

Upload on /contact — up to 2 files, 4 MB each. Prefer STEP over a locked ZIP. One enquiry covers CNC, vacuum casting, 3D printing, sheet metal, rapid tooling and injection molding, quoted as one program rather than six separate orders. Related Insights: CNC prototype small batch China RFQ, MOQ prototype / small batch, aluminum CNC enclosure China RFQ. Process landings: CNC machining China, aluminum enclosure China, CNC prototype China, small-batch CNC China, humanoid robot enclosure China.

Within one working day

Process route, DFM risks named, firm quotation. Not a calculator placeholder.

Before any cutting

DFM is a decision point. Thin walls, unreachable features and stack-ups are answered first.

With the parts

CMM reports, material certificate and export paperwork for the agreed Incoterm travel with the crate.

Upload STEP & request China RFQ

Five items

China RFQ checklist — what turns a range into a number

ItemWhat formWithout it
3D geometrySTEP, IGES or X_TNo process route can be quoted
Tolerances2D PDF drawing, or ISO 2768 class namedEvery dimension becomes a range
Material and finishGrade plus treatment / finish per surface groupTwo prices, one for each assumption
QuantityPieces per part, and whether it repeatsSet-up cannot be amortized
Date neededTarget week; FOB / CIF / DDP if knownStandard lead time assumed, which may be slower

Related deep dives: Drawing Package China RFQ — what to include, CNC prototype small batch China RFQ, MOQ prototype / small batch, aluminum CNC enclosure China RFQ, what we need to quote a robot shell, DFM & first article, contact / Upload STEP, how to RFQ a China manufacturer, RFQ reply SLA, RFQ tolerance guide.

How to package the upload

Send this instead of a vague brief

01Export STEP / IGES / X_TOne part per file keeps the quote unambiguous.
02Add the 2D where fit mattersOr name ISO 2768 on the sheet.
03State grade + quantity band1 / 10 / 50 / 200+ is enough to start.
04Finish calloutsAs-machined, anodize, paint, polish — per surface group.
05Target week + IncotermFOB, CIF or DDP so freight is comparable.
06Upload on /contact2 files, 4 MB each — or WhatsApp / email.
Send thisInstead ofEffect
STEP or IGESA PDF drawing onlyRemoves a day of redrawing
ISO 2768 class namedNo tolerance statementEvery dimension stops being a range
Quantity band“How much?”Set-up can be amortized properly
Target weekNo dateRoute chosen against your date, not ours
One part per fileA 40-part assembly in one fileEach part gets its own route and price
Drawing package ready

China RFQ checklist vs incomplete pack

Buyers searching a China RFQ checklist and a Drawing Package China RFQ need the same outcome: a pack complete enough for a firm number. Incomplete packs stay range-only — see the full attach list on what to include in a drawing package.

MissingWhat reply becomesFix before Upload STEP
STEP only, no 2D / ISO 2768Range on fit-critical dimsAdd PDF or name ISO 2768 class
No quantity bandSet-up cannot be amortizedState 1 / 10 / 50 / 200+
No finish / mask notesTwo prices, one per assumptionCall out finish per surface group
No need-by / IncotermStandard lead + freight assumedTarget week + FOB / CIF / DDP
40-part assembly in one fileAmbiguous routesOne part per STEP file

Also useful for the same China RFQ thread: CNC prototype Insight, MOQ Insight, aluminum enclosure Insight.

China RFQ landings

Process-specific quote pages

If you already know the process, these landings carry the same upload CTA with process-specific checklists.

CNC machining China

Factory quote, 0.01 mm bores, CMM first article.

Aluminum machining China

6061 / 7075 enclosures, anodize-ready surfaces.

Humanoid robot parts China

Shells, covers and fit-critical frames — one RFQ.

Vacuum casting China

Silicone molds from CNC masters, small-batch covers.

How to RFQ a China manufacturer

Factory quote guide before you hit upload.

Quote a robot shell

Enclosure RFQ pack that turns a range into a number.

DFM & first article

DFM before cut; first-article CMM before batch.

Services hub

CNC, vacuum, sheet, 3D, tooling — one China RFQ.

Drawing Package China RFQ

What to include so the China RFQ pack stays firm.

CNC prototype small batch

Prototype → small batch China RFQ day bands.

MOQ / No MOQ

One-piece MOQ — same inspection chain.

Aluminum enclosure RFQ

Billet / CNC shell checklist for China RFQ.

Aluminum enclosure China

Dedicated path for enclosure programs.

CNC prototype China

Dedicated path for prototype RFQs.

Small-batch CNC China

Dedicated path for small-batch CNC.

Humanoid robot enclosure

Dedicated path for humanoid shells.

Upload STEP & request China RFQ

Questions buyers ask
What belongs on a China RFQ checklist before Upload STEP?

A drawing-package-ready China RFQ checklist: STEP/IGES/X_T (one part per file), 2D PDF or named ISO 2768 where fit matters, material grade, quantity band, finish per surface group, need-by week and preferred Incoterm. Pair Drawing Package China RFQ — what to include, then Upload STEP on the contact form (up to 2 files, 4 MB each).

How does this China RFQ checklist relate to a Drawing Package China RFQ?

This page is the buyer checklist before a China RFQ; the Drawing Package China RFQ Insight lists what to include in the attach pack (STEP + 2D + tol + finish + qty + revision). Incomplete packs get a range — not a firm number. Use both, then Upload STEP on /contact.

Is a sketch or photo enough for an RFQ?

A photograph of a sketch or a physical sample is enough to start a conversation. Neither replaces a toleranced drawing where parts mate — without that, the reply stays a range rather than a firm number.

Do I need an NDA before sending drawings?

Yes if you want one, and it is usually faster to sign yours. Drawings are not shared outside the program and are held for the retention period agreed in the order.

What is the minimum order quantity?

One piece. The same inspection chain runs for a single prototype and for a batch, with only the sampling depth changing. See also the MOQ prototype / small-batch Insight.

How fast do I get a reply after uploading?

Usually within one working day: a process route, a DFM view naming tolerance risks, and a quotation. Where a feature cannot be made as drawn, the alternative is proposed with the price difference.

Also useful: Upload STEP / China RFQ, Drawing Package China RFQ, CNC prototype Insight, MOQ Insight, aluminum enclosure Insight, DFM & first article, aluminum enclosure China, CNC prototype China, small-batch CNC China, how to RFQ a China manufacturer.

Ready to quote

Upload STEP — China RFQ checklist (drawing package ready)

Attach a drawing-package-ready STEP pack on /contact (up to 2 files, 4 MB each). Pair what to include in a drawing package. Rocky Chen replies with a process route, DFM risks and a quotation — usually within one working day.

Upload STEP & request China RFQ

ContactRocky Chen
BaseSuzhou, Jiangsu, China. Visits by appointment.